City of Oneonta Market Street Improvements Phase 1: Demolition Project

The Project consists of the demolition of an existing three (3) level parking garage, two (2) CMU stair towers, CMU Trailways building within the garage, and Water St. Extension bridge, stabilization of retaining wall on the south side of Water Street utilizing low density cellular concrete fill, hazardous materials removals, construction of a new 3-sided permanent retaining wall at the southeast corner of Water Street, and miscellaneous electrical, and utility work, located at 47 Market Street in Oneonta, NY.

Status

Bidding Closed

Prebid Date 8/10/23 10:00am
Bid Date 8/23/23 2:00pm

Company & Contacts

Wendel Companies
Laura Mastracci  
716-688-0766 lmastracci@wendelcompanies.com

Location

47 Market Street, Oneonta NY

This job requires a nonrefundable fee made payable to Avalon.

An electronic download is available made payable to Avalon.